Albian Muskeg River Labour & Equipment Supply
Albian Sand Energy Inc. is the operator of the Muskeg River Mine located 75 kilometres north of Fort McMurray. The site produces 155,000 Bbls of bitumen per day for the Athabasca Oils Sands Project which is a joint venture among Shell Canada Limited, Chevron Canada and Marathon Oil Canada Corporation.
NACG supplies equipment and labour to perform work that is extraneous to the core mine production and have been doing this since the mine began production 7 years ago.
In recent years this has included:
Muskeg Stripping
Salvaging of reclamation material
Supplying drivers for Albian’s fleet of Cat 797 trucks
In pit piping for dewatering
Building an external tailing dyke
Mine site reclamation
Tailing dyke, laying perforated pipe for geotechnical control
Construction of a toe berm
Grading for a pilot plant site
Trenching
Assisting other mechanical contractors with site grading